Gateway betweenEast and West

What our two siteS have in common

  1. Reports on soil, construction conditions and location of buildings have been prepared for all sites. The zoning of the sites is complete.
  2. A risk assessment prepared according to the Uptime Institute, ISO 22237 and EN-50600-2 for data center use has been completed.
  3. Fiber connection to the Russian border, Frankfurt, Stockholm, and Helsinki. RTD estimation to Frankfurt is 23,5 ms.
  4. Up to 200 MW of electrical power is available for the areas. Fingrid substations are located 400 meters from the areas.
  5. Reliable energy supply duplicated, directly connected to Fingrid’s (Finnish National Grid) network, which ensures uninterrupted electricity supply.
  6. Direct air cooling or cooling with lake water is possible.
  7. Proximity to district heating network Site I and Site II.
  8. An RD project related to heat storage is underway in the area.

Site I

Size of the area:

28.27 ha

PERMITTED BUILDING AREA:

Plot ratio 0.7, floor area 197,894 m2

ZONED AREA:

Land zoning ready and final, industrial plot for data center use

Site II

Size of the area:

14.28  ha

PERMITTED BUILDING AREA:

Plot ratio 0.7, floor area 99,974 m2

ZONED AREA:

Land zoning ready and final, industrial area.

The coolest place for your data center